dithomas
Electrical
- Oct 18, 2002
- 74
I am on the hunt fot a replacment controller for an existing PLC based Westinghouse Auto Transfer. The existing scheme uses three 15kV WLI Switches as a Main - Tie - Main with a preferred and alternate untility feed. The two main ssitches are fused.
The Westinghouse PLC is obsolete with no service support and we would like to replace it with a new controller.
All thoughts and comments appreciated.
Thank you all in advance.
The Westinghouse PLC is obsolete with no service support and we would like to replace it with a new controller.
All thoughts and comments appreciated.
Thank you all in advance.