eddush
Chemical
- May 13, 2005
- 1
Can anyone let me know what one mighy expect in the way of a percentage of original cost on dismantling and liquidating a chemical facility. Theoretically speaking, much of the cost is associated with direct and indirect costs and cost associated with assets that carry little value such as piping, wiring etc. If anyone has been involved in anything like this let me know.