Dec 24, 2003 #1 sese Civil/Environmental Oct 11, 2003 17 0 0 PS why it's more often to use micro piles in caves and diffecult places like inside building
Dec 25, 2003 #2 Focht3 Geotechnical Aug 23, 2002 1,840 0 0 US It has to do with the size of the equipment needed to install the piles. Big piles require big equipment - Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora. Upvote 0 Downvote
It has to do with the size of the equipment needed to install the piles. Big piles require big equipment - Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora.