dklarz
Mechanical
- Mar 31, 2005
- 89
I hired an outside resource to complete some fairly complex exploded view drawings for me. All of the part models and base assembly drawings were completed and saved to our EPDM vault. I did a pack-n-go on all of the models and sent them to the drafting house. Now that they're done with them, I need to put check them back into the vault. Any suggestions on what's the best way to do that? I seem to be running into problems with part to assembly associations.
Thanks - Dave
Contractin' Dave
Mechanical Design Engineer
25 years in the contracting world
Thanks - Dave
Contractin' Dave
Mechanical Design Engineer
25 years in the contracting world