Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Minimum Allowable Thickness for Pipeline Installed by Open Cut Method 1

Status
Not open for further replies.
Replies continue below

Recommended for you

Yoga,

Your attachments don't work I'm afraid. Please try again or use the image function.

Also you question is not clear. Do you mean a min t for a road crossing? or just plain open trench. but yes agree with Mr 44 - API 1102 is your go to design code for checking crossing designs.

but why do you ask? This is only one very small part of pipeline design. What position are you / responsibility and who else is there to guide you?

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
 
Thank you for the recommendation, right now i'm doing final project about HDD for steel pipe, i'm just curious about this information, if for case plain open trench or crossing river (the location close to road btw) is it still valid to use API 1102 or is there another code ?

For information, currently i'm still undergrad student.
 
Status
Not open for further replies.
Back
Top