Many design codes and specifications (e.g. AASHTO & AISC) require that bolted connections for structurally significant components contain a minimum of two bolts, regardless of the strength required.
Today I was working with the NDS Timber design spec and noticed that this requirement doesn't seem to be included. Did I miss it, or is one connector all that is required for bolted/lagged timber connections?
Thanks!
Today I was working with the NDS Timber design spec and noticed that this requirement doesn't seem to be included. Did I miss it, or is one connector all that is required for bolted/lagged timber connections?