We are installing 4 inch schedule 40 PVC in an electrical substation at a depth of 30 inches below grade. The purpose of the pipe is to serve as a conduit for electrical relay cables. There will be some heavy traffic driveing over the conduit on a regular basis. I need an equation that will give me the maximum live load, (over the top of the pipe)assuming 90% compaction of fill, or minimum cover necessary
to facilitate heavy semi-trucks moving in the yard.