GregLocock
Automotive
- Apr 10, 2001
- 23,653
Only a the pilot plant stage so far. $10/tonne of water, which is slightly less than what I pay for water brought in by tanker. 4 kWh/tonne, but that is highly dependent on the quality of the incoming water.
A small but sensible contribution to a Net Zero grid - it can respond in real time to variations in solar activity, and does not need batteries (much).
Cheers
Greg Locock
New here? Try reading these, they might help FAQ731-376