mricks
Civil/Environmental
- Mar 13, 2009
- 11
I have a HEC-RAS model for a stream crossing a proposed Interstate (parallel bridges). As it happens the stream is divided under the upstream bridge and comes together between the two parallel structures. By necessity the upstream bridge will need to be larger than the downstream bridge to maintain the low flow conditions. The model runs fine when considering an Energy only approach, however due to the regulations we must run a WSPRO analysis. Every time this is run, no flow is allowed in RAS through the downstream bridge. Any ideas what is causing this?
Thanks
Thanks