I have a some amount of experience using Caesar however I am not an expert by any means. I have a task to do which involves modeling an already installed pipe system and then seeing if the support system can handle a heavier component such as a valve.
Now my system is such that the piping is connected to a steam vessel (no thermal growths given by the vendor for this vessel) and then goes to a a 40 ft section on a pipe rack.
Now I have drawn out the system such that I anchored at the nozzle for now and went to the header however only to the first support along that header (otherwise I'd be modeling an entire piping run). I left this end with a +Y support as it's on a beam and has a guide support as well.
My main problem is that there is an already installed spring hanger. Using the program I let Caesar design the spring for me. Now the problem (if it is an actual problem) is that the spring hanger that was selected doesn't match what is on the installed spring's drawings. For example, CII selected a hanger with a spring constant of 1500 lb/in with a travel around -0.2 inches (cold load about 2500 lb) whilst what is actually on the drawing is a spring constant of 380 lb/in with a travel of about -0.7 inches (cold load around 4100 lb.). (This is modeling the system as actually installed). Now I am not sure as to if the original designer over designed or something.
Now I am pretty sure that my model is somewhat wrong as my springs don't match up. Can anyone assist me in my task or at least lend some advice on how to accomplish this ? I can upload the model if anyone is able to assist.
I have a some amount of experience using Caesar however I am not an expert by any means. I have a task to do which involves modeling an already installed pipe system and then seeing if the support system can handle a heavier component such as a valve.
Now my system is such that the piping is connected to a steam vessel (no thermal growths given by the vendor for this vessel) and then goes to a a 40 ft section on a pipe rack.
Now I have drawn out the system such that I anchored at the nozzle for now and went to the header however only to the first support along that header (otherwise I'd be modeling an entire piping run). I left this end with a +Y support as it's on a beam and has a guide support as well.
My main problem is that there is an already installed spring hanger. Using the program I let Caesar design the spring for me. Now the problem (if it is an actual problem) is that the spring hanger that was selected doesn't match what is on the installed spring's drawings. For example, CII selected a hanger with a spring constant of 1500 lb/in with a travel around -0.2 inches (cold load about 2500 lb) whilst what is actually on the drawing is a spring constant of 380 lb/in with a travel of about -0.7 inches (cold load around 4100 lb.). (This is modeling the system as actually installed). Now I am not sure as to if the original designer over designed or something.
Now I am pretty sure that my model is somewhat wrong as my springs don't match up. Can anyone assist me in my task or at least lend some advice on how to accomplish this ? I can upload the model if anyone is able to assist.