Hello, attached is the model that I'm currently working on. I'm fairly new to HydroCAD. In the bottom row is the existing condition; a catchment to a infiltration basin which then goes over a weir and through a culvert. The reason node 27P is shown as a pond is because there is a wetland that can act like overflow storage to the infiltration basin before exiting through the culvert.
For the proposed, I am trying to model some of catchment 2 (whatever is possible given the model) to go the existing infiltration basin and the rest to continue to the natural stream (which I modeled as an extremely large area since it is not that relevant and all the flow from catchment 2 currently goes there now).
I tried a weir in the diversion structure but I am getting crazy overflow messages and errors even when routing the smallest amount to the existing infiltration basin. I'm not sure if I modeled splitting the flow correct or not (I'm assuming I didn't). If anyone could point me in the right direction it would be much appreciated.
Thanks
For the proposed, I am trying to model some of catchment 2 (whatever is possible given the model) to go the existing infiltration basin and the rest to continue to the natural stream (which I modeled as an extremely large area since it is not that relevant and all the flow from catchment 2 currently goes there now).
I tried a weir in the diversion structure but I am getting crazy overflow messages and errors even when routing the smallest amount to the existing infiltration basin. I'm not sure if I modeled splitting the flow correct or not (I'm assuming I didn't). If anyone could point me in the right direction it would be much appreciated.
Thanks