SemiPE
Structural
- May 15, 2013
- 34
Hi all. I have 2 beams of the same size that will be supported by a girder (also same size). The beam on the right will have a moment due to cantilever action and the beam on the left will balance out that moment (because its other end is pinned). Will Full penetration weld be enough to constitute as a moment connection, to transfer the moment from one beam to another?
I would usually put the beam on top of the girder so that the beam would act like a continuous beam, but the architect would not let me do that.
I would usually put the beam on top of the girder so that the beam would act like a continuous beam, but the architect would not let me do that.