Looking at a primary heating system: A control statement, monitoring the run status of the boiler , will enable the lead hot water circulation pump. My question is, what physical instrument on location monitors the run status of the boiler? A pressure sensor maybe or a contact on the boiler panel that closes when the boiler starts? Thanks for the help.