europipe
Chemical
- May 14, 2007
- 710
Need some advice.
I have to provide new LT´s on pressure vessels (~4barg)
The proj.eng. wants to do this without a valve between the nozzle and the LT.
I think that is not the way.
How can I convince him?
Or is it okee what he says.
Greetings and thanks in advance
I have to provide new LT´s on pressure vessels (~4barg)
The proj.eng. wants to do this without a valve between the nozzle and the LT.
I think that is not the way.
How can I convince him?
Or is it okee what he says.
Greetings and thanks in advance