Hi all,

I am wondering if it is possible to move a part of a sub assembly to the main assembly without having to basically start from scratch. For instance if a brass bushing was added in the sub assembly when it should have been assembled in the final assembly, is there a way to drag it into the main assembly?

Thanks!

Joel
 
Replies continue below

Recommended for you

Unlike Solid Works where you can just drag and drop a part between assemblies, Solid Edge provides the Transfer command to do that, thus ensuring it can't be done accidentally.
It's on the Home > Modify group in ST.
Note that if you transfer a part out of an assembly that is used more than once, you will lose that part from all instances of the assembly.
You will get a message to inform you if this is the case, and that the total part count will change. This is because the transfer is done ONCE only, from the sub-assembly you've chosen, so the instances in the other sub-assemblies will be lost.
There is a simple way round this - let me know if you need it.

There is also the Disperse command that moves all parts in a sub-assembly up to the next level, and then removes the sub-assembly.
This does not affect the sub-assembly file itself - that will still contain the parts. You can use this method for placing commonly used groups of parts, although System Library is the better way to do this.

bc.
2.4GHz Core2 Quad, 4GB RAM,
Quadro FX4600.

Where would we be without sat-nav?
 