I would like to know the scope of MPI (magnetic particle inspection) for API 5CT Coupling (Material Grade T-95 and size 16").
As per my below interpretation of API 5CT, Coupling receives magnetic particle inspection twice ??
** clause 9.14.2-All couplings shall be inspected on the outside and inside surfaces after finish machining and before any inside or outside surface plating, using the wet fluorescent magnetic particle method in accordance with ISO 13665 or ASTM E709.
** clause 10.15.11 and table E.62 - NDE is required for coupling stock by one or more of the following methods: UT, MPI, Flux leakage or EMI
My question is: If MPI is carried out by vendor as per clause 10.15.11 on Coupling stock at mother material mill, then can we waive MPI for coupling after finish machining?
Your earliest advice is highly anticipatad.
As per my below interpretation of API 5CT, Coupling receives magnetic particle inspection twice ??
** clause 9.14.2-All couplings shall be inspected on the outside and inside surfaces after finish machining and before any inside or outside surface plating, using the wet fluorescent magnetic particle method in accordance with ISO 13665 or ASTM E709.
** clause 10.15.11 and table E.62 - NDE is required for coupling stock by one or more of the following methods: UT, MPI, Flux leakage or EMI
My question is: If MPI is carried out by vendor as per clause 10.15.11 on Coupling stock at mother material mill, then can we waive MPI for coupling after finish machining?
Your earliest advice is highly anticipatad.