I need to load banks of batteries OPZS (850 Ah c100) with one diesel generator of 60 kW.
The time of load foreseen is 6 hours a day.
Can someone recommend to me the most suitable system of load?
Thanks
I need to load banks of batteries OPZS (850 Ah c100) with one diesel generator of 60 kW.
The time of load foreseen is 6 hours a day.
Can someone recommend to me the most suitable system of load?
Thanks