Hi All
In metal forming, theoretically, a multi-step wire drawing is better than a single step one, since the gradually drawing of the wire would lead to less defects and die wear and so on , but in practice, more dies means longer stops in case the drawing dies break or when a new wire set is gonna be set into the drawing machine. Is there a solution through this problem ? which selection is the better one ?
In metal forming, theoretically, a multi-step wire drawing is better than a single step one, since the gradually drawing of the wire would lead to less defects and die wear and so on , but in practice, more dies means longer stops in case the drawing dies break or when a new wire set is gonna be set into the drawing machine. Is there a solution through this problem ? which selection is the better one ?