nhcf
Electrical
- Oct 22, 2014
- 74
In an industrial site where the utility provides a primary metered service - 4 wire grounded wye to a single pad-mount transformer. Is a gang-operated load break switch - pole mounted - suitable to serve as the service disconnecting means? Or is a padmount switch or switchgear lineup required. The utility will be providing metering upstream of this disconnect, on the pole, so no metering compartment required.