david339933
Industrial
- Jun 15, 2011
- 1,204
Can two separate procedures (processes) with hardness testing to NACE MR0175 be combined to fill a single joint, or does harness testing have to be done on a coupon with both processes in the same coupon.
Ex: GTAW root (procedure 1)
SMAW fill (procedure 2)
Can I combine these two procedures in a single joint and still meet the requirements of NACE MR0175 or do I need a pqr coupon containing both these processes harness tested?
Ex: GTAW root (procedure 1)
SMAW fill (procedure 2)
Can I combine these two procedures in a single joint and still meet the requirements of NACE MR0175 or do I need a pqr coupon containing both these processes harness tested?