GenB
Mechanical
- Oct 24, 2003
- 1,362
on scotch boilers, we do not weld about 2 in at the edge of the smoke box on the long seam weld joint, the sub-nde x-rayed the complete long seam and reported unwelded part as lack of fussion. The AI now wants me to reweld and re-x-ray the edge . are they in their right mind or not? My understanding is that if the edges are not part of the pressure "drum" or outside of the pressure boundaries, there is no need for nde on that part. Any advise and/or coments thanks, GB