rogerj1
Electrical
- Jan 5, 2007
- 23
To all,
What seems to be the latest and greatest scheme in Negative Sequence Protection? In our practice, we use SEL relays operate on a negative sequence overvoltage element (59Q). This method is designed to protect a power transformer from "single phasing".. or the loss of a primary phase conductor. It is my understanding, that when a Delta-WyeGnd transformer looses a primary phase, there will be one secondary phase at nominal voltage, and the other two secondaries at 1/2 nominal voltage. (in PT secondary, this is 120V, 60V & 60V seen at the relay). In this condition, we have the 59Q pickup for a duration and produce a trip. We also implement an undervoltage blocking element to prevent false tripping in the case of a lost secondary voltage (ie. a blown secondary fuse from a PT, PT maintenance, etc). Generally, we reset this condition once a 52a contact has closed back in, but, we have had some problems with this as well. I'm interested in using 51Q schemes and wondering if any of you might have some thought or experience on the matter. Thanks your help and the forum!
What seems to be the latest and greatest scheme in Negative Sequence Protection? In our practice, we use SEL relays operate on a negative sequence overvoltage element (59Q). This method is designed to protect a power transformer from "single phasing".. or the loss of a primary phase conductor. It is my understanding, that when a Delta-WyeGnd transformer looses a primary phase, there will be one secondary phase at nominal voltage, and the other two secondaries at 1/2 nominal voltage. (in PT secondary, this is 120V, 60V & 60V seen at the relay). In this condition, we have the 59Q pickup for a duration and produce a trip. We also implement an undervoltage blocking element to prevent false tripping in the case of a lost secondary voltage (ie. a blown secondary fuse from a PT, PT maintenance, etc). Generally, we reset this condition once a 52a contact has closed back in, but, we have had some problems with this as well. I'm interested in using 51Q schemes and wondering if any of you might have some thought or experience on the matter. Thanks your help and the forum!