rockman7892
Electrical
- Apr 7, 2008
- 1,161
Does anyone have any recommended settings for negative sequence voltage (47) and current(46)relay elements located at 4.16kV Main Switchgear. It appears that these functions are strictly being used to detect voltage and current unbalance on the plant distribution system. Not sure if these functions are typically used on facility main breaker or if designer just blindly specified these settings to trip breaker simply because they are in the relay.
I have seen 5% pickup used for voltage unbalance and 10% used for current unbalance but not sure of delay settings to use on mains? Perhaps coordinate time delay with unbalance settings on downstream 4.16kV motor relays?
I have seen 5% pickup used for voltage unbalance and 10% used for current unbalance but not sure of delay settings to use on mains? Perhaps coordinate time delay with unbalance settings on downstream 4.16kV motor relays?