cw1info
Specifier/Regulator
- Dec 30, 2003
- 4
My boss has a question:
The new seismic moment frame joint found in July Modern Steel Construction and revisited in Sept. 2004 issue consists of a friction type moment connection.
What happens to the connection if the seismic movements pass the limits of the pin-fuse joint?
The new seismic moment frame joint found in July Modern Steel Construction and revisited in Sept. 2004 issue consists of a friction type moment connection.
What happens to the connection if the seismic movements pass the limits of the pin-fuse joint?