Hi everyone
I'm a naval architec so this is kinda new to me ! Hope to hear from everyone here
I'm currently facing some problem with the fixed work. How do i assign the effort in the first place ?
I have to allocation manpower for a job
(1 labourer -> 532mandays ) max.26
(1 engineer -> 5.25mandays ) max.13
how can i go about doing this without contradicting the overall schedule ? And also both worker have different pay rate !
HELP GUYS !