I would like to create a new model view set, but I would like to use a non-canned view as the base view.
In other words I have a custom view in my model and would like easily create new projected views off of it.
Can I do that ?


Jerry J.
UGV5-NX1899
 
Replies continue below

Recommended for you

I use View Set in modeling to do that.

I design all of my tooling in body, using various WCS/Datum CSYS to work from. I'll do a "set view to WCS" and then "View set".
Then when creating my drawing I'll select the view set as my base view in the drop down
 