wd1980
Petroleum
- Apr 9, 2019
- 47
folks,
as per NFPA 11, it is stated that :
7.3.5.1 A reserve supply of foam concentrate sufficient to meet system design requirements shall be provided in
order to put the system back into service after operation.
7.3.5.2 The reserve supply shall be in separate tanks or compartments, in drums or cans on the premises, or available
from an approved outside source within 24 hours.
is it the responsability of vendor to supply the reserve?
as per NFPA 11, it is stated that :
7.3.5.1 A reserve supply of foam concentrate sufficient to meet system design requirements shall be provided in
order to put the system back into service after operation.
7.3.5.2 The reserve supply shall be in separate tanks or compartments, in drums or cans on the premises, or available
from an approved outside source within 24 hours.
is it the responsability of vendor to supply the reserve?