Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

NFPA 13 (2013) 7.8 Exposure Protection

Status
Not open for further replies.

j54961

Mechanical
Oct 7, 2013
1
I am looking for some help in the area of Exposure Protection, 7.8 / 11.3.2 / 23.7. These are the (3) areas along with NFPA 80A for exposure protection. The question I have is anyone run up against the issue with NO Windows? I have a building addition(140'-0") that is within the 60' of the lot line. So petition came in and was approved with exposure protection. The issue is I am asked by the reviewer to cover the length of the wall 22'-8" x 8'-0"(spacing) per sprinkler @ 181.363 sq ft per to cover the .20 gpm requirement from Table 23.7.1. Exposure is less than .23 with construction for severity, and I am looking at protection with (1) line of heads.


J54961
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor