Yes. NFPA 13, to my knowledge, does not allow for 2 hr walls to separate a floor so that you don't need multiple systems in that size of a project.
It is my understanding that the system size limitation is based on maximum "allowable" impairments when a system is taken out of service for maintenance. Otherwise, in a wet pipe system, why not just have one system for 500,000 sq ft.