SprinklerDesigner2
Mechanical
- Nov 30, 2006
- 1,251
I'm laying out the corridor sprinklers in a four story hotel using residential sprinklers.
The ceiling is a mix of 2'x2' tile and drywall. The 2'x2' tile ceilings are at 8'-6" above finished floor while the drywall portions are at 8'-0" above finished floor.
All sprinkler heads are through drywall ceiling area.
Refer to partial drawing
I am pretty sure this layout is fine but something is gnawing at me that I just can't put my finger on. Do you see anything wrong with this layout?
Thanks
The ceiling is a mix of 2'x2' tile and drywall. The 2'x2' tile ceilings are at 8'-6" above finished floor while the drywall portions are at 8'-0" above finished floor.
All sprinkler heads are through drywall ceiling area.
Refer to partial drawing
I am pretty sure this layout is fine but something is gnawing at me that I just can't put my finger on. Do you see anything wrong with this layout?
Thanks