Mohamedsayed
Civil/Environmental
- Apr 16, 2013
- 61
Hello Abaqus users,
My model and elastic model which is divided into 10 steps, i checked the results, i found something strange. from step #1 to step#4 every thing looks good, i.e., the number of increments shown in the job module>> monitor are the same as that shown in the viewer. for step #5, it should be 15 increments, in Abaqus viewer, i found only 10, For step #6, it should be 15 increments, i found that message "no frames available for step. the same thing happens for the remaining steps, so from steps #5 to step #9 i found "no frame available for step".
I checked the number of increments for every step in the from job module>> monitor.
please note that the field output was propagated from the first step to the final step. the initial time increment is 0.01, and the maximum is 0.1.
Also i checked the input file for steps 5 -9, i found that the field output card is included (*output, field, variable =preselect)
could you please help me and tell me what is wrong.
Thanks
My model and elastic model which is divided into 10 steps, i checked the results, i found something strange. from step #1 to step#4 every thing looks good, i.e., the number of increments shown in the job module>> monitor are the same as that shown in the viewer. for step #5, it should be 15 increments, in Abaqus viewer, i found only 10, For step #6, it should be 15 increments, i found that message "no frames available for step. the same thing happens for the remaining steps, so from steps #5 to step #9 i found "no frame available for step".
I checked the number of increments for every step in the from job module>> monitor.
please note that the field output was propagated from the first step to the final step. the initial time increment is 0.01, and the maximum is 0.1.
Also i checked the input file for steps 5 -9, i found that the field output card is included (*output, field, variable =preselect)
could you please help me and tell me what is wrong.
Thanks