visitor
New member
- Mar 28, 2002
- 117
When our company pours floor slab, we have been using a non calcium chloride accelerator, I think it is a 1%-2% Pozzulan. This is because of the cooler tempatures. The cost of these non calcium chloride add 20% to our concrete cost. With the use of rebar in our slab I am trying to find a more economical way of cuting these accelorator cost. Any suggestions would be greatly appriated.