antidude
Civil/Environmental
- Apr 13, 2013
- 2
Hi everybody.
I have a problem with my model, it is a building with 22 stories and 3 basements, it have shear walls with columns and beams, i have assigned hinges to the frames, and shell nonlinear layered to the walls and i have loaded a motion ground or time history function, the load case is a nonlinear time history with direct integration. But it take a long time, because the substeps in the analysis process are very small when the model begin to plasticized, i want to optimize it. What can i do?
I understand that the parameters of control solution and a integration solution can change and solve this problem, but i dont have idea about this parameters.
so, can any help me with this problem?
Thank you.
PD: i have uploaded my model on sendspace.
Model: Link
Model: Sap2000 V.15.1
I have a problem with my model, it is a building with 22 stories and 3 basements, it have shear walls with columns and beams, i have assigned hinges to the frames, and shell nonlinear layered to the walls and i have loaded a motion ground or time history function, the load case is a nonlinear time history with direct integration. But it take a long time, because the substeps in the analysis process are very small when the model begin to plasticized, i want to optimize it. What can i do?
I understand that the parameters of control solution and a integration solution can change and solve this problem, but i dont have idea about this parameters.
so, can any help me with this problem?
Thank you.
PD: i have uploaded my model on sendspace.
Model: Link
Model: Sap2000 V.15.1