ive recently come accross some specs internally that say
> FO's you need 5 upstream and downsteams. (not the flow meters) the standard FO's for pump min flow recycles on pumps.
I've not seen this before as 20+ years as a process engineer, has apparently its due to pipe errosion has anyone actually seen an issue with this for non -compliance ?
> NRV's I've seen an internal spec for 2 D downstream and 5D upstream - again ive never seen this and seen hundreds of NRV's just on valves and near bends and i'm not aware of a single failure or failure report - is this a valid reason..
Looking for a general perspective on this
> FO's you need 5 upstream and downsteams. (not the flow meters) the standard FO's for pump min flow recycles on pumps.
I've not seen this before as 20+ years as a process engineer, has apparently its due to pipe errosion has anyone actually seen an issue with this for non -compliance ?
> NRV's I've seen an internal spec for 2 D downstream and 5D upstream - again ive never seen this and seen hundreds of NRV's just on valves and near bends and i'm not aware of a single failure or failure report - is this a valid reason..
Looking for a general perspective on this