wayuu1981
Mechanical
- Sep 15, 2006
- 47
Hello, is there any standard or common practice to define the number of startups during a boiler service life (cold, warm and hot startups).
Our company is working on the bid terms for a new coal fired utility, 280 MWe, ACFB boiler, and we would like specify a minimun number of startups during service life (the higher the better) but, we are not sure about how many to request.
In the same area, burning the same coal, and using the same thecnology (ACFB boiler, condensing turbine with reheating, natural circulation), we are erecting a 150 MWe utility, and the boiler manufacturer guaranteed at least 120 cold starts, 1200 warm starts and 3000 hot starts during a 30 years service life. Are these values common? can they be increased? is ussual for a boiler manufacturer to receive this kind of requirements?
Thanks in advance for your help
Javier Guevara E.
Projects, Mechanical Engineer
Our company is working on the bid terms for a new coal fired utility, 280 MWe, ACFB boiler, and we would like specify a minimun number of startups during service life (the higher the better) but, we are not sure about how many to request.
In the same area, burning the same coal, and using the same thecnology (ACFB boiler, condensing turbine with reheating, natural circulation), we are erecting a 150 MWe utility, and the boiler manufacturer guaranteed at least 120 cold starts, 1200 warm starts and 3000 hot starts during a 30 years service life. Are these values common? can they be increased? is ussual for a boiler manufacturer to receive this kind of requirements?
Thanks in advance for your help
Javier Guevara E.
Projects, Mechanical Engineer