cubalibre000
Mechanical
- Jan 27, 2006
- 1,070
Hi,
custom symbol can be related (linked) to the master symbol, so if I change the original master, all referenced symbol can be updated to the change.
There is a setting / option that advise me that the part symbol must be updated because the master had changed, without to go to the out-of date folder in drafting and manually click on 'refresh' ?
For example, in the bottom of the drawing, NX say if view need to be updated, but symbol no.
Solutions or ER ?
Thank you...
Using NX 8 and TC8.3
custom symbol can be related (linked) to the master symbol, so if I change the original master, all referenced symbol can be updated to the change.
There is a setting / option that advise me that the part symbol must be updated because the master had changed, without to go to the out-of date folder in drafting and manually click on 'refresh' ?
For example, in the bottom of the drawing, NX say if view need to be updated, but symbol no.
Solutions or ER ?
Thank you...
Using NX 8 and TC8.3