Hi,
I'm collecting input data for a Detail offshore pipeline project.
Regarding the soil liquefaction analysis due to seismic hazard I'm collecting data regarding Peak Ground Acceleration assosiaceted with return period of 200, 500 and 1000 years.
My question is which is return period to be considered during design for seismic load?
Is there any standard or guidelines to be followed?
Thanks