joan271273
Electrical
- Sep 26, 2000
- 119
I am not involved directly with this project, but the project has a load of 30MW which is under design for it's own power plant. During a meeting the Designer and the Owner disagreed over the basis of design. The main issue was a single unit ( GE LM 6000 ) arrangment vs having three (3) small units ( GE LM 1600 or Solar equivalent ).
The Owner did not favored smaller units due to LOLP,LOF,etc which are loss of load probability,etc. I could not gather much but I would like to learn more about this analysis ( and associated criteria ) can someone point me to links that address this topic
The Owner did not favored smaller units due to LOLP,LOF,etc which are loss of load probability,etc. I could not gather much but I would like to learn more about this analysis ( and associated criteria ) can someone point me to links that address this topic