Hello guys,
My issue is that I am doing a project which contains lots of MEP openings in walls, the project is structurally critical as well .. I know that in ACI code there are some restrictions and guide lines for openings in walls, however what I want to know is how much I can allow with this topic (beyond the code if possible based on experience .. ?).
Does anyone knows a book that I can refer to regarding this issue ?
Thanks ..
My issue is that I am doing a project which contains lots of MEP openings in walls, the project is structurally critical as well .. I know that in ACI code there are some restrictions and guide lines for openings in walls, however what I want to know is how much I can allow with this topic (beyond the code if possible based on experience .. ?).
Does anyone knows a book that I can refer to regarding this issue ?
Thanks ..