ugfest
Civil/Environmental
- Mar 10, 2003
- 5
I have a catch basin discharging into a stone trench through a pipe. The trench is sized for the 2 year storm. Any greater storm is supposed to fill the trench and then overflow through the top of the catch basin. Is there a way to set a maximum elevation in the trench so that once the elevation is reached, it will overflow the top of catch basin. Or maybe another way to model this.
Thanks
Thanks