luu
Civil/Environmental
- Jul 8, 2001
- 3
hi all !
i am required to design a supporting system for an overhead travelling crane of safe working load of 25 tonnes, clear span of 25m and a length of 50m. Does anyone know any useful information on this ..
any help will be greatly appreciated
thanks
kien luu
i am required to design a supporting system for an overhead travelling crane of safe working load of 25 tonnes, clear span of 25m and a length of 50m. Does anyone know any useful information on this ..
any help will be greatly appreciated
thanks
kien luu