we have project and we install (P-Trap ) on each floor drain point . the supplier bring the floor drain it self with ( S trap ) . is there any Problem to keep the (P-trap) ? i.e we have (S-trap ) on the floor drain and the n we have (P-Trap ) on pipe Line