gastrouble
Petroleum
- Feb 24, 2012
- 4
Dear all,
We rigged up on a well and frac'd well with 2 7/8" 6.5# P110 8R ERW pipe. String weight was 45K but post frac we couldnt pull tbg out of hole upon pulling 130K. We cut tubing above the packer and it came out looking like so. What would cause this?
I have attached 2 pictures to this post in the link below. Its a zip file.
Thanks all to your help! Happy Easter!
We rigged up on a well and frac'd well with 2 7/8" 6.5# P110 8R ERW pipe. String weight was 45K but post frac we couldnt pull tbg out of hole upon pulling 130K. We cut tubing above the packer and it came out looking like so. What would cause this?
I have attached 2 pictures to this post in the link below. Its a zip file.
Thanks all to your help! Happy Easter!