GemmellG
Materials
- Jun 28, 2012
- 89
Currently installing Boiler Proper (P4) & Boiler external (P4A) piping in Canada. We have had to modify some of the piping either by adding pipe sections or reducing pipe runs. My question is are the modifications considered a repair & should be recorded on a repair/Alteration report.