RFreund
Structural
- Aug 14, 2010
- 1,881
I'm trying to get a preliminary idea on sizes/anchors, etc, for some excavation bracing for an excavation to an existing bluff.
How would you estimate the passive resistance of the berm in front of the sheet piling. This seems to be somewhat debated.
I'd be interested in using both short duration values and long-term effective values (mixed phi-c)?
If I use some sort of effective slope, it exceeds the effective friction angle. The effective soil values are approx phi = 28-32 deg and c= 200-500psf.
Thanks!
EIT
How would you estimate the passive resistance of the berm in front of the sheet piling. This seems to be somewhat debated.
I'd be interested in using both short duration values and long-term effective values (mixed phi-c)?
If I use some sort of effective slope, it exceeds the effective friction angle. The effective soil values are approx phi = 28-32 deg and c= 200-500psf.
Thanks!
EIT