Lets say you have a structural slab supported on grade beams and piles. After time, the soil immediately under the slab has settled some feet. A new owner takes the building, and wants to trench the slab to run new plumbing.
Initially, the plumbing was installed, then hangers were cast into the slab to hold up the plumbing.
How do you hang new plumbing from the existing slab and then recast the trenched piece?