ed666
Civil/Environmental
- Feb 12, 2013
- 8
Hello I need to build a paved storage area for WWTP sludge. I will have all organic soil removed, have base material and pavement. What is the recommended thickness, type of material under the pavement. note that there will be heavy loafers and dump truck going into this area, we have sometime about 10m high of sludge, the area is about 50m x 25m and it will be in a are experiencing temperature between -30C to +30C. Thanks. Eric