cabsta
Mining
- Apr 17, 2010
- 1
My company is looking into manufacturing a few pressure vessels & piping that mus meet the Pressure Equipment Directive.
The vessels all fall into the SEP category.
We are planning on welding some piping assemblies & vessel and testing to 1.5 the rated pressure.
We’ve done some basic calcs & FEA on the forces & stresses on the joints and welds and we are happy with the design.
Would this procedure be suitable for SEP or is there anything else we need to worry about? (eg coded welding, material certs, technical files)
Any links to external references would be appreciated.
The vessels all fall into the SEP category.
We are planning on welding some piping assemblies & vessel and testing to 1.5 the rated pressure.
We’ve done some basic calcs & FEA on the forces & stresses on the joints and welds and we are happy with the design.
Would this procedure be suitable for SEP or is there anything else we need to worry about? (eg coded welding, material certs, technical files)
Any links to external references would be appreciated.