Feb 17, 2023 #1 ritsa p Mechanical Aug 19, 2021 4 0 0 GR which is the amount (per cEnt RT ) needed for bw in water tubes of boiler ?? The tender offer don't refer the amount of ndts.
which is the amount (per cEnt RT ) needed for bw in water tubes of boiler ?? The tender offer don't refer the amount of ndts.
Feb 17, 2023 #2 weldstan Materials Jun 24, 2011 2,730 0 0 US As a contractor, we used to RT the first weld made by each welder and about 2% of welds made thereafter. Owners specs often required 10% RT and in at least on one project 100%. What did your specifications call for? Upvote 0 Downvote
As a contractor, we used to RT the first weld made by each welder and about 2% of welds made thereafter. Owners specs often required 10% RT and in at least on one project 100%. What did your specifications call for?
Feb 17, 2023 #3 EdStainless Materials May 20, 2004 15,892 0 0 US If you have the NDT procedure the default test frequency should be in there. = = = = = = = = = = = = = = = = = = = = P.E. Metallurgy, consulting work welcomed Upvote 0 Downvote
If you have the NDT procedure the default test frequency should be in there. = = = = = = = = = = = = = = = = = = = = P.E. Metallurgy, consulting work welcomed
Feb 17, 2023 #4 MJCronin Mechanical Apr 9, 2001 5,086 0 36 US Tha "per cEnt RT) needed for bw in water tubes of boiler" iz defined by da "Codea Konstruction" for da Boilerz, man !!! Ya gotta look dere !!!! ....inna Code, Mon .... Fo Schizzle ma drizzle !!! Webop talk in deez hallowed Forums, Bro... MJCronin Sr. Process Engineer Upvote 0 Downvote
Tha "per cEnt RT) needed for bw in water tubes of boiler" iz defined by da "Codea Konstruction" for da Boilerz, man !!! Ya gotta look dere !!!! ....inna Code, Mon .... Fo Schizzle ma drizzle !!! Webop talk in deez hallowed Forums, Bro... MJCronin Sr. Process Engineer