Dear all,
By using estimated Q-values and empirical design chart proposed by Barton (1993), spacing of rock bolts, length of the bolts and thickness of shotcrete (unreinforced or reinforced) for ground supporting of a tunnel can be determined.
My questions are:
(1) How to determine size of the rock dowels, eg Y25, or Y32?
(2) The thickness of lining suggested by the chart can be interpreted as total thickness of permanent lining + initial lining?
(3) Any suggested design guilde for drill & blast rock tunnel?
Thanks a lot.
By using estimated Q-values and empirical design chart proposed by Barton (1993), spacing of rock bolts, length of the bolts and thickness of shotcrete (unreinforced or reinforced) for ground supporting of a tunnel can be determined.
My questions are:
(1) How to determine size of the rock dowels, eg Y25, or Y32?
(2) The thickness of lining suggested by the chart can be interpreted as total thickness of permanent lining + initial lining?
(3) Any suggested design guilde for drill & blast rock tunnel?
Thanks a lot.