Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Permanent and Initial Ground Support for Tunnel Excavation

Status
Not open for further replies.

sango

Geotechnical
Oct 5, 2002
15
Dear all,

By using estimated Q-values and empirical design chart proposed by Barton (1993), spacing of rock bolts, length of the bolts and thickness of shotcrete (unreinforced or reinforced) for ground supporting of a tunnel can be determined.

My questions are:

(1) How to determine size of the rock dowels, eg Y25, or Y32?

(2) The thickness of lining suggested by the chart can be interpreted as total thickness of permanent lining + initial lining?

(3) Any suggested design guilde for drill & blast rock tunnel?

Thanks a lot.
 
Replies continue below

Recommended for you

sango,

Maybe have a go posting in the Underground Structure Engineering forum.

Jeff
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor